So, I have cleared the land, cut and stacked the trees for firewood and
chipped the branches and sticks.  What's next?  Delivery time!  The whole
building came on one 18 wheeler.  It took the guy 13 hours to drive it from
Indiana to NY and find the house.  It took him another 40 minutes to get the
truck into the driveway and back to the clearing.  Unbelievable!!!
Here is the delivery truck with the garage
all bundled up on the back, half way to
where he needs to go.
Here he is all the way in the backyard.  
Other than the loss of two mud flaps, it is
amazing that nothing else got damaged!
Having fun driving the forklift.  That's Rob
on the flatbed giving me directions . . .
Here's Rob and Neighbor Dave unloading
the last of the steel . . .
Many thanks to Rob, Dave and Doug who
helped unload the truck and guide me
around.  If it wasn't for them, I never
would have got it done.  Thanks again, guys!

Next up?

Delivery of the insulation.  Wait until you see this one!



More to come . . .
Dave's Ultimate Garage !
Part III